Work

Arch House

Full remodel · 2025

  • Location [Suburb], [City]
  • Completed 2025
  • Duration 12 months
  • Size 448 m²

What we found

Beautiful arches, failing everywhere else

The arched windows were the reason our clients fell for it. Behind them were rising damp, failed wiring and a pool that had been empty for a decade.

What we did

We kept the arches and renewed the rest

Damp-proofing, new services and a rebuilt pool terrace in honed limestone. The interiors were finished in limewash and oak so the arches could be the focus.

Before
After

Key changes

  • Original arched windows restored
  • Rising damp treated throughout
  • Pool rebuilt with limestone terrace
  • Full rewire and replumb
  • Oak floors and joinery
Previous project
Next project

Start a project

Have a property with potential?

Bring us the house you’ve found, or let us help you find one. Every great home starts with a conversation and a proper plan.

Plaster archway opening onto a courtyard with a green tree