Process

From potential to home

Two phases, one team. First we plan the whole home down to the last tile and rand. Then we build it, with the same people who drew it.

Before we start

Find

Bring your property, or we source one with you.

As long as it takes

Phase 0

Plan

Design, engineering, budget, timeline and approvals.

Typically 3–6 months

Phase 1

Build

Sourcing, construction, interiors, landscaping, handover.

Typically 8–18 months

00

Before we start

Find the property

Every dream home starts with the right property. There are two ways in.

Option one

Bring your property

A house you already own, or one you are about to buy. We visit, assess its potential and tell you honestly what it can become.

Option two

We source it with you

Tell us where and how you want to live. Our team finds properties with potential and runs a feasibility check on each one before you commit.

0

Phase 0 · Consultation

Plan it completely

Our architects, engineers and designers take the property with potential and produce a full plan: what it will look like, what it will cost, how long it will take, and drawings ready for council.

01

Brief and site visit

We meet on site, listen to how you want to live and assess what the property can become.

02

Surveys and feasibility

Measured and structural surveys, zoning and title checks, so the plan rests on facts.

03

Moodboards and concept

Materials, colours, layouts and sketches you can react to before anything is fixed.

04

Value engineering workshop

Together we sort must-haves from nice-to-haves, and plan for what comes later.

05

Detailed design and engineering

Architectural drawings, structural engineering, interior design and a full finishes schedule.

06

Budget and timeline

A complete cost plan and programme, so you know what it costs and when you move in.

07

Council-ready plans

Drawings prepared and submitted for municipal approval.

Value engineering

Spend where it matters

In our workshops we sort every idea into three lists. It keeps the budget honest today and makes room for the home you will want in ten years.

Must-haves

Built now, no compromise

  • Structural repairs and a sound roof
  • Waterproofing and damp control
  • Electrical and plumbing renewal
  • Solar power with battery backup
  • The rooms you will live in every day

Nice-to-haves

Included if the budget allows

  • Pool and pool terrace
  • Outdoor kitchen
  • Wine room or cellar
  • Bespoke furniture throughout
  • Upgraded stone finishes

Plan for later

Prepared now, built when you are ready

  • Foundations and slab sized for a second storey
  • Services routed for a future pool or cottage
  • Structure ready for a future extension
  • Space set aside for a garden studio
  • Approved plans for phase two

1

Phase 1 · Build

Build it beautifully

We take your dream home and build it. The team that drew the plans manages every trade, supplier and rand until the keys are in your hand.

01

Sourcing and procurement

Materials, fittings and finishes from trusted suppliers, ordered to the programme.

02

Price negotiation

We negotiate supply and trade prices on your behalf.

03

Labour and site team

Vetted trades, managed daily by our site lead.

04

Construction

Structure, roofing, services and every finish, built to the approved plans.

05

Interior design and installation

Joinery, lighting, fittings and finishes installed exactly as designed.

06

Landscaping

Gardens, courtyards, irrigation and outdoor rooms.

07

Furniture and styling

Bespoke pieces from our furniture studio, if you would like them.

08

Handover

Final inspection, compliance certificates, manuals and the keys.

Questions

Good to know

Do you take on small renovations?

No. We only work on whole homes: complete remodels, full transformations and new builds. For a single room or a kitchen refit, a specialist contractor will serve you better.

Can I use the Phase 0 plans with another builder?

Yes. The plans, budget and drawings from a Consultation are yours to keep. Most clients choose to build with us, but you are never locked in.

Can you help me find a property?

Yes. Our team sources properties with potential and checks the feasibility of each one before you commit.

Are your projects fully permitted?

Every project has approved plans, registered contractors and full sign-off from the municipality, including the certificates you need at handover.

How long does a project take?

Planning usually takes three to six months and building eight to eighteen, depending on the home. Your Phase 0 timeline gives you real dates.

Start a project

Have a property with potential?

Bring us the house you’ve found, or let us help you find one. Every great home starts with a conversation and a proper plan.

Plaster archway opening onto a courtyard with a green tree